Constrution Time Table Watch

3/10/2012

1 Comment

 
Above is a short video of the War Memorial project just as works were starting to move the roadway from its orginal course for the duration of the project, which at the end will see it being a tunnel under the garden memorial site above. Whole project has to be completed for ANZAC Day 2015 to commerate 100 years since Gallopilli landings. 
All now complete April 25 2015
Picture
The idea behind this part of the blog is to give a perspective on the time taken for construction. We have picked some sites around town and will keep a note of progress through photographic evidence to illustrate the time taken for construction. Any recommendations gratefuly accepted.

Picture
Tory Street Il Casino Site
1/10/2012. Cranes on site this week putting in place the supports to hold up the original fascade that is being incorporated into the new building.

.



Picture
30/10/12 Ground works on foundations starting with drils on site. Front fascade only structure on site.
Picture
7.3.2013 Central core to third floor approximately with steel work at second floor level.

Picture
4/4/2013 Central concrete core up to approximetely sixth floor, steel work up to fourth floor level.

Picture
13/4/2013 Another floor on the concrete core

Picture
10/5/2013 Construction up to the 9th floor by my counting.

Picture
29/5/2013 More progress on the infill on the lower levels

Picture
31/5/2013 Glazing panes to lower level being put in place

Picture
14/6/2013 More of shell enclosed

Picture
28/6/2013 Closing in continues

Picture
28.7.2013 Closing in continues

Picture
Progresse to 12.9.2013

Picture

Picture
24 July 2013

Picture
6 January 2014

Picture
7 February Scaffolding down front elevation painted. Building complete  and now occupied. 16 months from cranes arriving on site.

Picture
174 Vivian Street Petrol Station
Ground works underway 23/10/12.
5/11/12. Structures for service station starting to be erected.
3/12/2012 Ground works still being undertaken. More structure to the retail sturctures.

Picture
4/2/13
Structure for canopy in place

Picture
2/4/2013 Petrol Station opened approximately four months from start.

Picture
One Market Lane
19/1/2013 Site cleared and pileing being drilled
27/3/2013 Main site crane being erected

Picture
13/4/2013 Excavation of footings

Picture
30/4/13 First of reinforcing bars above ground appearing

Picture
16/5/2013 First of ground level concrete being poured

Picture
23/5/2013 First of ground floor columns having concrete poured

Picture
29/5/2013 Site offiec structrues being put in place, boardings to perimeter

Picture
5/7/2013 Second floor reinfocing starting to appear

Picture
22/7/2013 Second floor now covering majority of site

Picture
10/1/2014 Frame work continuing up


Picture
18/2/2014 Starting to compllete framework

Picture
7/3/2014 Upper Levels Steel work going into place

Picture
3/4/2014 Glazing appearing in lower levels.

Picture
26/6/2014 Scaffolding starting to disappear

Office occupied
Picture
One Market Lane 28 July 2014.
Picture
One Market Lane 13 October 2014 scaffolding coming down from upper levels
Picture
One Market Lane with all scaffolding down 28 November 2014 twenty three months from the start of works
6 /July 2014 Office levels occupied. Eighteen months since start of site prepartion.
Picture
24 Taranaki Street
Demolition underway 23/10/12 of the old Brendon Motors building and vacant upper level premises formely Liks night club. CAS  undertaking new apartment block named Elevate. 
6/11/12 Site now clear of buildings
3/12/2012 Site now clear of 
machinery no activity.

Picture
6/5/2013 Base of site crane in place. Work being undertaken on sprung foundations

Picture
18.6.2013
Steel work starting to come out of the ground on the northern end of the site

Picture
5/7/2013 Five levels of steel work up in the northern corner

Picture
27 November 2013

Picture
18/2/2014 Getting to the top of the exterior.

Picture
Elevate Complete and Occupied 28 July 2014
Picture
Clyde Quay The Overseas Terminal Building
29/12/2012 The structure starting to emerge
Picture
The Overseas Terminal
21/5/2013 The shape starting to become obvious

Picture
25/7/2013 Eastern end of struture now being started.

Picture
18/9/2013 Western end enclosed

Picture
17/6/2014 All scafolding down, ready to occupy in a weeks time

Picture
8 Frandi Street

Construction Of  A Single Dwelling
27/6/13
Site cleared and drieway prepared. Footing excavated for foundations

1 Comment
ken
28/11/2012 12:07:14 pm

Hi Peter,

Great site! Fantastic idea to create construction time table watch too!

I have interest in the Il Casino project, which has been awfully delayed.

What do you think of it, given your extensive expertise in the local real estate market? Good location? How long do you reckon they may take to finish construction?

Many thanks.

Cheers

Reply

Your comment will be posted after it is approved.


Leave a Reply.

    Discussion on timeframes of construction, valuation of leasehold, waterfront property,
    Picture

    Author

    Hi I am Peter Kavanagh and have been involved in the property sector for the past thirty years most of it in Wellington.
    I love talking property so add your thoughts.

    Picture

    Archives

    November 2015
    September 2015
    August 2015
    July 2015
    June 2015
    November 2014
    October 2012
    September 2012
    August 2012
    May 2012

    RSS Feed



    Categories


    All
    Valuation Of Property Leaseholds